⌘ K
Shift Handover
Auto-generated summary · Shift A → Shift B · sign and pass on issues
Shift Handover Note
Shift A → Shift B
Friday, 16 May 2026 · Plant CHB-01
Auto-generated · 13:55
Awaiting signatures
Shift OEE
71.4%
Target
78.0%
Good output
6,062 pcs
Defects
160 pcs (2.6%)
1. Top losses this shift
1. Welder 07 · unclassified downtime42 min
2. Setup — Tool change (3 events)38 min
3. Welder 04 · minor stops (jam)18 min
4. C3 quality defect spike14 min
2. Open issues for incoming shift
HIGHWelder 07 — ongoing downtime, root cause uncertain
AI suggests Tool change (78%) but operator suspects tip degradation. PdM scheduled 18 May.
MEDC3 defect rate trending up (5.2% vs 2.1% baseline)
Mostly scratches on painted surface. Suspect cooling. Maintenance to investigate.
MEDD4 changeover in progress — PN-4521 → PN-9118
Started 14:08, expected complete 14:30. First good part needed for QA sign-off.
3. Operator notes (added by Somchai K.)
“Welder 07 ได้ยินเสียงผิดปกติตอน startup เช้านี้ ทำให้สงสัย bearing. แจ้งช่างซ่อมแล้ว. กะ B โปรดสังเกตเสียงตอนเริ่มเดินเครื่อง.”
4. Unresolved alerts · 3
OEE dropped 22% in 30 minLine B2 — Welding12m
Material starvation detectedLine F6 — Robot Cell6m
Defect rate trending upLine C3 — Final QC24m
Signatures
Outgoing · Shift A
Somchai K.
Somchai K. · Operator13:54
Incoming · Shift B
✎ Somying M.
Tap to sign
Tap to sign
8-hour timeline
06:0007:0008:0009:0010:0011:0012:0013:0014:00
Attachments
📷
welder07-anomaly.jpg
2.4 MB
📷
defect-sample.jpg
1.8 MB
🎤
voice-note.m4a
0:42
Previous handovers
15 May · 22:00
B → C
15 May · 14:00
A → B
15 May · 06:00
C → A
14 May · 22:00
B → C